Industrial Burner for Gas BIO
- Large capacity range up to 1000 kW
- Maintenance-friendly thanks to modular design
- Robust burner design
- Direct or lance ignition
- Control via ionization or UV sensor
- Suitable for new systems and modernization of existing systems thanks to individual length adjustment
- Air preheating to 450°C available as an option
- Low polluting level thanks to optimized combustion
- For installation as ceiling or side-wall burner thanks to arbitrary installation position
- Can be combined with different combustion chamber shapes
Learn More:
Description Documentation Ordering Information Accessories
Ordering Information |
Alternate Product |
|||||||||||
Model and Description |
Lead Time | Model | Lead Time | Order | ||||||||
BIO 50HB-50/35-(27)C Burner Size: 50; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 50; Position of Burner Head: 35; Burner Head ID: 27; Construction stage: C |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50HB-100/35-(11)C Burner Size: 50; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 100; Position of Burner Head: 35; Burner Head ID: 11; Construction stage: C |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50RB-150/135-(27)B Burner Size: 50; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 150; Position of Burner Head: 135; Burner Head ID: 27; Construction stage: B |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50HB-200/135-(11)C Burner Size: 50; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 200; Position of Burner Head: 135; Burner Head ID: 11; Construction stage: C |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50RB-250/235-(27)B Burner Size: 50; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 250; Position of Burner Head: 235; Burner Head ID: 27; Construction stage: B |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50HB-300/235-(11)C Burner Size: 50; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 300; Position of Burner Head: 235; Burner Head ID: 11; Construction stage: C |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50RB-350/335-(27)B Burner Size: 50; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 350; Position of Burner Head: 335; Burner Head ID: 27; Construction stage: B |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50HB-400/335-(11)C Burner Size: 50; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 400; Position of Burner Head: 335; Burner Head ID: 11; Construction stage: C |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50RB-450/435-(27)B Burner Size: 50; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 450; Position of Burner Head: 435; Burner Head ID: 27; Construction stage: B |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 50HB-500/435-(11)C Burner Size: 50; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 500; Position of Burner Head: 435; Burner Head ID: 11; Construction stage: C |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65RB-50/35-(37)E Burner Size: 65; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 50; Position of Burner Head: 35; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65RB-150/135-(37)E Burner Size: 65; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 150; Position of Burner Head: 135; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65RB-250/235-(37)E Burner Size: 65; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 250; Position of Burner Head: 235; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65RB-350/335-(37)E Burner Size: 65; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 350; Position of Burner Head: 335; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65RB-450/435-(37)E Burner Size: 65; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 450; Position of Burner Head: 435; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65HB-100/35-(34)E Burner Size: 65; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 100; Position of Burner Head: 35; Burner Head ID: 34; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65HB-200/135-(34)E Burner Size: 65; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 200; Position of Burner Head: 135; Burner Head ID: 34; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65HB-300/235-(34)E Burner Size: 65; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 300; Position of Burner Head: 235; Burner Head ID: 34; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 65HB-400/335-(34)E Burner Size: 65; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 400; Position of Burner Head: 335; Burner Head ID: 34; Construction stage: E |
Contact Us | Not available for online purchase. | ||||||||||
BIO 65HB-500/435-(34)E Burner Size: 65; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 500; Position of Burner Head: 435; Burner Head ID: 34; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80RB-50/35-(6)E Burner Size: 80; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 50; Position of Burner Head: 35; Burner Head ID: 6; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80RB-150/135-(6)E Burner Size: 80; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 150; Position of Burner Head: 135; Burner Head ID: 6; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80RB-250/235-(6)E Burner Size: 80; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 250; Position of Burner Head: 235; Burner Head ID: 6; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80RB-350/335-(6)E Burner Size: 80; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 350; Position of Burner Head: 335; Burner Head ID: 6; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80RB-450/435-(6)E Burner Size: 80; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 450; Position of Burner Head: 435; Burner Head ID: 6; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80HB-100/35-(16)F Burner Size: 80; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 100; Position of Burner Head: 35; Burner Head ID: 16; Construction stage: F |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80HB-200/135-(16)F Burner Size: 80; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 200; Position of Burner Head: 135; Burner Head ID: 16; Construction stage: F |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80HB-300/235-(16)F Burner Size: 80; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 300; Position of Burner Head: 235; Burner Head ID: 16; Construction stage: F |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80HB-400/335-(16)F Burner Size: 80; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 400; Position of Burner Head: 335; Burner Head ID: 16; Construction stage: F |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 80HB-500/435-(16)F Burner Size: 80; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 500; Position of Burner Head: 435; Burner Head ID: 16; Construction stage: F |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100RB-50/35-(70)E Burner Size: 100; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 50; Position of Burner Head: 35; Burner Head ID: 70; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100RB-150/135-(70)E Burner Size: 100; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 150; Position of Burner Head: 135; Burner Head ID: 70; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100RB-250/235-(70)E Burner Size: 100; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 250; Position of Burner Head: 235; Burner Head ID: 70; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100RB-350/335-(70)E Burner Size: 100; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 350; Position of Burner Head: 335; Burner Head ID: 70; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100RB-450/435-(70)E Burner Size: 100; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 450; Position of Burner Head: 435; Burner Head ID: 70; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100HB-100/35-(37)E Burner Size: 100; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 100; Position of Burner Head: 35; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100HB-200/135-(37)E Burner Size: 100; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 200; Position of Burner Head: 135; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100HB-300/235-(37)E Burner Size: 100; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 300; Position of Burner Head: 235; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100HB-400/335-(37)E Burner Size: 100; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 400; Position of Burner Head: 335; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 100HB-500/435-(37)E Burner Size: 100; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 500; Position of Burner Head: 435; Burner Head ID: 37; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125HB-100/35-(2)D Burner Size: 125; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 100; Position of Burner Head: 35; Burner Head ID: 2; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125RB-50/35-(1)D Burner Size: 125; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 50; Position of Burner Head: 35; Burner Head ID: 1; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125HB-200/135-(2)D Burner Size: 125; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 200; Position of Burner Head: 135; Burner Head ID: 2; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125RB-150/135-(1)D Burner Size: 125; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 150; Position of Burner Head: 135; Burner Head ID: 1; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125HB-300/235-(2)D Burner Size: 125; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 300; Position of Burner Head: 235; Burner Head ID: 2; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125RB-250/235-(1)D Burner Size: 125; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 250; Position of Burner Head: 235; Burner Head ID: 1; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125HB-400/335-(2)D Burner Size: 125; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 400; Position of Burner Head: 335; Burner Head ID: 2; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125RB-350/335-(1)D Burner Size: 125; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 350; Position of Burner Head: 335; Burner Head ID: 1; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125HB-500/435-(2)D Burner Size: 125; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 500; Position of Burner Head: 435; Burner Head ID: 2; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 125RB-450/335-(1)D Burner Size: 125; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 450; Position of Burner Head: 335; Burner Head ID: 1; Construction stage: D |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140RB-50/35-(47)E Burner Size: 140; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 50; Position of Burner Head: 35; Burner Head ID: 47; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140RB-150/135-(47)E Burner Size: 140; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 150; Position of Burner Head: 135; Burner Head ID: 47; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140RB-250/235-(47)E Burner Size: 140; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 250; Position of Burner Head: 235; Burner Head ID: 47; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140RB-350/335-(47)E Burner Size: 140; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 350; Position of Burner Head: 335; Burner Head ID: 47; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140RB-450/435-(47)E Burner Size: 140; Flame shape: Normal; Gas Type: Natural Gas; Length of Burner Tube: 450; Position of Burner Head: 435; Burner Head ID: 47; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140HB-100/35-(26)E Burner Size: 140; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 100; Position of Burner Head: 35; Burner Head ID: 26; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140HB-200/135-(26)E Burner Size: 140; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 200; Position of Burner Head: 135; Burner Head ID: 26; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140HB-300/235-(26)E Burner Size: 140; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 300; Position of Burner Head: 235; Burner Head ID: 26; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140HB-400/335-(26)E Burner Size: 140; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 400; Position of Burner Head: 335; Burner Head ID: 26; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More | ||||||||
BIO 140HB-500/435-(26)E Burner Size: 140; Flame shape: Long; Gas Type: Natural Gas; Length of Burner Tube: 500; Position of Burner Head: 435; Burner Head ID: 26; Construction stage: E |
12-14 weeks | EMB | In Stock | Learn More |
For all other configurations and spare parts Contact Combustion 911
Description
The BIO burner is designed for industrial furnaces and firing systems in the iron and steel industries in the precious, non-ferrous, and light metal sector, as well as in the plastics, fiber, and paper industries. Other fields of application are thermal incineration installations, as well as dryers and hot-air generators.
For low temperature applications (e.g. for crucible heating, radiant tube heating, or hot-air generation), the burners are equipped with a heat-resistant steel attachment tube.
For high temperature applications (e.g. forging furnace), the burners are used in combination with a burner quarl made from refractory concrete. Different flame shapes can be achieved by using burner quarls with a different geometry.
The burner can be adapted to the system requirements using different burner tube lengths.
Documentation
FAQ: Kromschröder Product Labels and Type Codes (Blog Post) | |
Industrial Burner BIO Brochure | |
Industrial Burner BIO Operating Instructions | |
Industrial Burner BIO Technical Information |
Accessories
Model and Description | Price | Cart |
Ignition Cable Silicone Rubber Cable High Voltage 7mm (priced per foot). |