Coming soon!
Q2 Parametric Burner Controller
- Supports natural and forced draught gas burners
- Blue flame oil burners
- Single stage burners
- Permanent operation
- Air pressure switch
- Fuel pressure switch
- Up to four (4) fuel valves
- Air valve or fan output
- Valve proving system (tightness control)
- Flame detection via UV sensor, dual or single electrode
- Optional 2nd UV flame detector
- Independent and configurable flame sensitivity
- Electro-optical shutter control
- Ignition transformer can be housed inside
- 3-point actuator with preset positions and remote modulation control
- High-temperature mode for indirect flame surveillance and flameless operation
- Built-in fieldbus control, IIoT ready
- Front magneto-optic jack for configuration and commissioning
- LED-bar flame signal indicator
- Advanced self-diagnostic report of cycle status, lockouts, and failures
- Log memory for lockouts, faults, unit, and valves, operating time
Learn More:
Description Documentation Ordering Information
Ordering Information
Model and Description | Stock |
Q2 | Coming Soon! |
Q2 | Coming Soon! |
Q2 | Coming Soon! |
Q2 | Coming Soon! |
Description
Contrive uses the term “parametric” to illustrate that the operation of Q2 can be tailored to virtually any burner technology or application through the modification of parameters. While the use of parameter settings in burner controls is common, the Q2 takes this to the next level by providing the ability to modify parameters and behavior at each stage of the burner cycle. Activating and assigning a predefined duration to each stage allows you to define which fuel or air valves to turn on, to choose which inputs to control, and predefine an actuator position that controls the air or gas flow.
This nuanced approach makes it simple to configure Q2 to manage:
- Single stage direct ignition up to 350kW (1.2MM BTU/hr)
- Multistage (unlimited capacity)
- Intermittent or continuous operation
- On/off or modulating
- Flameless
- Staged gas
- Staged air
- Recuperative
- Regenerative
Documentation
Q2 Preliminary Installation Guide |